Project: BobCollins   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Bob Collins   -  
Project:   Vans - RV-12iS   -   VIEW REPORTS
Total Hours:1055
Total Expense:$101645.34
Start/Last Date:Jan 04, 2017 - No Finish Date
Engine:Rotax 912iS
Propeller:Sensenich
Panel:Dual screen G3X, autopilot
 
Friendly URL: https://eaabuilderslog.org?s=BobCollins

Home or Last Project Picture

Aug 13, 2019     Drilled hinge to gear-leg fairing - (2 hours)       Category: Landing Gear
The method of installing the hinge to the gear leg fairing leaves a lot to be desired. The instructions I had said to mark a centerline on the hinge and mark rivet holes and then clamp it into place and drill at the appointed locations. But the grey gelcoat prevents that from working.

Van's sent me updated instructions that said to transfer the center line to the fairing itself, then mark the rivet locations, then drill the holes, THEN clamp the hinge in place.

That's a better method but still difficult. It's hard to clamp the hinge, for one thing.

I got it done but it's nowhere near as good as I want. Center line? Ha!

In the end, the hinge didn't seat properly in the "V" of the gear leg fairing. I haven't riveted it on yet, but I'm also surprised that Van's is using an AN3-3.5 squeezed rivet instead of pop rivets here. Seems like getting a squeezer on it is problematic and threatens to distort the hinge.

We'll see.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.